1Chun-Wei R. Lin and Hsian-Jong Hsiau, 2009, Using an Efficient New Gene for Genetic Algorithm to Solve the Multi-Buyer Joint Replenishment Problem, Contemporary Management Review, Vol.5. (Accepted)(其他)
|
2.Chun-Wei R. Lin, Kuo-Hui Lin, and Sheng-Jie J. Hsu, 2009, Integration of Order Picking Process and Strategic Management of Distribution Path in a Distribution Center, Journal of Advanced Engineering, Vol.4, No.3. (in press)(其他)
|
3Chun-Wei R. Lin, Chien-Kuang Chen, and Fei-Long Chen, 2008, A Synchronized Modeling Approach for Strategic and Operational Planning, Journal of the Chinese Institute of Industrial Engineers, Vol.25, No.3, pp.187~203. (EI, TSSCI)
|
4Chun-Wei R. Lin, Sheng-Jie J. Hsu, and Nang-Shu B. Yang, 2008, Study of the Provision Fitness for the Professional Logistics Specialties in Taiwan, Logistics Management Review, Vol.3, No.1, pp.15~34. (其他)
|
5. Hong-Yi Chen, Chun-Wei R. Lin, and Yuehwern Yih, 2007, Production-distribution network design of a global supply chain alliance from the key player's perspective, International Journal of Production Research, Vol.45, No.2, 245~265. (SCI, EI)
|
6. Chun-Wei R. Lin, Oliver L. Hung, and Chelun Chen, 2006, A Strategic Quick Response Approach for Dynamic Supply Chain Management of Perishable Goods, International Journal of Industrial Engineering, Vol.13, Iss. 4, 374~383. (SCI, EI)
|
7. Chun-Wei R. Lin and Yue-Zen Taso, 2006, Dynamic Availability-Oriented Control of the Automated Storage/Retrieval System – A Computer Integrated Manufacturing Perspective, International Journal of Advanced Manufacturing Technology, Vol.29, No.9/10, pp.948~961. (SCI, EI)
|
8. Chun-Wei R. Lin, Yen-Ching Wong, and Oliver L. Hung, 2006, Workflow Oriented Information Integration for the Integrated Manufacturing and Commercial Environment – A Case Study of IMCC at NYUST, Commerce and Management Quarterly, Vol.7, No.1, pp.186~217. (其他)(製商整合科技教育改進計畫)
|
9. Chia-Heng Chang, Chwen-Tzeng Su, and Chun-Wei R. Lin, 2005, Inventory Modeling Simulation of the Green Supply Chain, Industrial Forum, Vol. 7, No. 1, pp.45~69. (其他)
|
10. Chun-Wei R. Lin and Hong-Yi S. Chen, 2004, A Fuzzy Strategic Alliance Selection Framework for Supply Chain Partnering under Limited Evaluation Resources, Computers in Industry, Vol. 55, pp.159~179. (SCI, EI)
|
11. Chun-Wei R. Lin and Hong-Yi S. Chen, 2003, Dynamic Allocation of Uncertain Supply for the Perishable Commodity Supply Chain, International Journal of Production Research, Vol. 41, No.13, pp.3119~3138. (SCI, EI)(NSC87-2213-E-224-019)
|
12. Chun-Wei R. Lin, Hong-Yi Chen, and Qing-Shun Xiao, 2001, Dynamic Integrated Process Planning and Scheduling, Journal of the Chinese Institute of Industrial Engineers, Vol. 18, No. 2, pp.21-32. (EI, TSSCI)(NSC89-2213-E-224-021)
|
13. Chun-Wei R. Lin, 2000, A Production-Efficiency Oriented Approach for Evaluating the Performance of a Local Area Network, Journal of the Chinese Institute of Industrial Engineers, Vol. 17, No. 2, pp.199~212. (EI, TSSCI)(電腦整合製造系統中以機動生產為導向之區域網路效益評估, NSC86-2213-E-224-009)
|
14. Chun-Wei R. Lin, 2000, Alternative Shop Floor Control of a Flexible Manufacturing System – A Temporal Rescheduling Approach, International Journal of Industrial Engineering, Vol. 7, Iss. 2, pp.168~178. (SCI, EI)
|
15. Chun-Wei R. Lin, 1999, A Study of the Order Feasibility Evaluation Decision Support System Based on the Fuzzy Concurrent Engineering Architecture, Journal of Business Administration, Vol.44, pp.131-163. (其他)
|
16. Chun-Wei R. Lin, 1999, A Study of Professional Requirements and Curriculum Configuration for Technological and Vocational Education Automation(技職教育商業自動化專業才能之需求與課程區隔研究), Journal of Technology, Vol. 14, No. 1, pp.13~22. (其他)(商業自動化課程區隔之研究)
|
17. Chun-Wei R. Lin, 1998, Availability-oriented Real-time Scheduling of a Flexible Manufacturing System, Journal of the Chinese Institute of Industrial Engineers, Vol. 15, No. 1, pp. 45-56. (EI, TSSCI)
|
18. Chun-Wei R. Lin, 1998, Dynamic Distribution Planning for an Automated distribution Center with Limited-Life Commodities, Journal of Commercial Modernization, Vol. 1, No. 1, pp.63-82. (其他)(易腐物品產銷策略聯盟內快速反應系統之機動控制研究, NSC87-2213-E-224-019)
|
19. Chun-Wei R. Lin, 1996, A Flow-Time-Based Approach for Parallel Production Scheduling, Journal of Science and Technology, Vol. 5, No. 2, pp. 19-34. (其他)
|
20. Chun-Wei R. Lin, 1996, Automated Orientation and Location Tolerances Control for High Precision Assembly Process Planning, Journal of Science and Technology, Vol. 5, No. 1, pp.1~16.
|