●論文發表: 期刊論文   研討會論文   其他研究成果   著作下載
 

期 刊 論 文

 

(一)國際期刊論文

  1. Lee, P.H., Y.C. Chang and C.C. Torng, 20XX, A design of s control charts with combined double sampling and variable sampling interval scheme, Communications in Statistics - Theory and Methods. (Accepted)(SCI, EI, IF: 0.406, 5-Year IF: 0.474)

  2. Chang, H.M., C. Huang and C.C. Torng, 2011, Shop floor control mechanism of aerospace machine shop, Applied Mechanics and Materials, Vol.52-54, pp.214-219.

  3. Lee, P.H.*, C.C. Torng and Y.C. Lin, 2011, Determination of the optimal accelerated burn-in time under Arrhenius-Lognormal distribution assumption, Applied Mathematical Modelling, Vol. 35, No. 8, pp. 4023-4030. (SCI, EI, IF: 1.375, 5-Year IF: 1.379)(NSC 99-2221-E-224-035-MY2)

  4. Chang, H.M., C. Huang, and C.C. Torng, 2011, The Reengineering of business and production processes for aerospace manufacturing suppliers, Key Engineering Materials, Vol.450, pp.401-404.(EI)

  5. Lee, P.H., C.C. Torng, J.C. Wu and C.C. Tseng, 2010, The effectiveness study of double sampling s charts application on destructive testing process, International Journal of Product Development, Vol. 12, No. 3/4, pp. 324-335. (EI-Inspec)

  6. Chang, H.M., C. Huang and C.C. Torng, 2010, The construction of production improvement model for aerospace manufacturing suppliers, Key Engineering Materials, Vol.443, pp.748-753. (EI)

  7. Torng, C.C., C.C. Tseng and P.H. Lee, 2010, Non-normality and combined double sampling and variable sampling interval X-bar control charts, Journal of Applied Statistics, Vol. 37, No. 6, pp. 955 – 967. (SCI, IF: 0.407, 5-Year IF: 0.536)
  8. Torng, C.C., C.K. Huang and H.M. Chang, 2010, Reliability Evaluation for Aerospace Anodizing Process of Aluminum, Materials Science Forum, Vol.638-642, pp.419-424.(EI)

  9. Huang, C.K., C.C. Torng and H.M. Chang, 2010, Stress Analysis on the Stretch Forming of the Aluminum Saddle-shaped Skins, Advanced Materials Research, Vol.89-91, pp.703-708.(EI)

  10. Torng, C.C., P.H. Lee, H.S. Liao and N.Y. Liao, 2009, An economic design of double sampling X-bar charts for correlated data using genetic algorithms, Expert Systems with Applications, Vol.36, No.10, pp.12621-12626. (SCI, EI, IF: 2.908, 5-Year IF: 3.162) (NSC 97-2221-E-224-032)

  11. Torng, C.C., P.H. Lee and N.Y. Liao, 2009, An economic-statistical design of double sampling X-bar control chart, International Journal of Production Economics, Vol.120, No.2, pp.495-500.(SCI, EI, IF: 2.068, 5-Year IF: 2.736) (NSC 97-2221-E-224-032)
  12. Torng, C.C., C.K. Huang and H.M. Chang, 2009, Process control for aerospace chemical milling process, International Journal of Manufacturing Technology and Management, Vol.18, No.3, pp.308-318. (EI)
  13. Torng, C.C. and P.H. Lee, 2009, The performance of double sampling X-bar control charts under non-normality, Communications in Statistics - Simulation and Computation, Vol.38, No.3, pp.541–557.(SCI, EI, IF: 0.383, 5-Year IF: 0.394)
  14. Torng, C.C., P.H. Lee and C.C. Tseng, 2009, An economic design of Tukey’s control chart, Journal of the Chinese Institute of Industrial Engineers, Vol.26, No.1, pp.53-59. (EI, TSSCI)
  15. Huang, C.K., C.C. Torng and H.M. Chang, 2008, Effects of springback on the stretch forming of the aluminum saddle-shaped skins, Steel Research International, Vol.79, pp.85-90. (SCI, EI, IF: 0.344, 5-Year IF: 0.500)
  16. Torng, C.C., C.K. Huang and H.M. Chang, 2008, Springback analysis of Ti-6Al-4V in hydro-forming process for aerospace sheet metal parts, Steel Research International, Vol.79, pp.288-292. (SCI, EI, IF: 0.344, 5-Year IF: 0.500)
  17. Torng, C.C. and P.H. Lee, 2008, ARL Performance of the Tukey’s control chart, Communications in Statistics - Simulation and Computation, Vol.37, No.9, pp.1904-1913.(SCI, EI, IF: 0.277, 5-Year IF: 0.319)
  18. Huang, C.K., C.C. Torng and H.M. Chang, 2007, Relationship between Saturation Curve and Peening Parameters for Aerospace Shot Peening Process, Materials Science Forum, Vol.561-565, pp.965-968. (EI)
  19. Torng, C.C., C.K. Huang and H.M. Chang, 2007, Distortion analysis of aluminum alloy for sheet metal forming after solution treatment, Materials Science Forum, Vol.561-565, pp.893-896. (EI)
  20. Wang, D.S., C.C. Torng, I.P. Lin, B.W. Cheng, H.R. Liu and C.Y. Chou, 2006, Optimization of nattokinase production condition using response surface methodology, Journal of Food Process Engineering, Vol.29, No.1, pp.22-35. (SCI, EI, IF: 0.849, 5-Year IF: 0.763)
  21. Torng, C.C., C.Y. Chou and H.R. Liu, 1999, Applying quality engineering technique to improve wastewater treatment, Journal of Industrial Technology, Vol. 15, No. 1, pp. 1-7. (EI)
  22. Torng, C.C., J.K. Cochran, D.C. Montgomery and F.P. Lawrence, 1995, Implementing statistically constrained economic EWMA control chart, Journal of Quality Technology, Vol. 27, No. 3, pp. 257-264. (SCI, EI, IF: 1.184, 5-Year IF: 1.533)
  23. Montgomery, D.C., C.C. Torng, J.K. Cocgran and F.P. Lawrence, 1995, Statistically constrained economic design of the EWMA control chart, Journal of Quality Technology, Vol. 27, No.3, pp. 250-256. (SCI, EI, IF: 1.184, 5-Year IF: 1.533)
  24. Torng, J.C.C., D.C. Montgomery and J.K. Cochran, 1994, Economic design of the EWMA control chart, Economic Quality Control, Vol. 9, pp. 3-23.

 

(二)國內期刊論文

  1. 李佩熹, 童超塵, 廖翊亨, 鍾承利, 2009, 韋伯分配參數估計法的比較與探討, 智慧科技與應用統計學報, Vol. 7, No.2, pp. 25-36.
  2. 林揚承, 李佩熹, 童超塵, 2009, 決定加速預燒試驗的最佳時間和溫度條件, 品質學報, Vol.16, No.4, pp. 281-290.(EI)
  3. 童超塵, 曾俊傑, 李佩熹, 張舜傑, 2009, 建構台灣IC設計產業之供應商績效評估模式及實證, 科技管理學刊, Vol.14, No.2, pp.1-26.
  4. 曾俊傑, 童超塵, 廖乃毅, 2008, 運用QFDFMEA建構顧客稽核缺失管理系統, 品質學報, Vol.15, No.5, pp.313-322. (EI)
  5. 廖乃毅, 李佩熹, 童超塵, 2008, 多重抽樣平均數管制圖的經濟性設計, 品質學報, Vol.15, No.4, pp.311-319. (EI)
  6. 李佩熹, 童超塵, 2008, 應用多次抽樣平均數管制圖於破壞性試驗製程之效益評估, 科技管理學刊, Vol.13, No.2, pp.95-112.
  7. 李佩熹, 童超塵, 2007, 損耗商品考慮指數型態需求率和韋伯損耗率的經濟訂購量模式, 商管科技季刊, Vol.8, No.4, pp.443-456.
  8. 王河清, 童超塵, 2001, 運用平衡計分卡建構新策略管理制度-以醫療產業為例, 醫院雜誌, Vol. 34, No. 4, pp.7-15.

 

(三)EI指標之國際研討會

  1. Tseng, C.C, and C.C. Torng, 2010, Prioritization of product design tasks using QFD, TRIZ and DSM, 17th International Conference on Industrial Engineering and Engineering Management, 2010/10/29-31, Xiamen, People's Republic of China. (EI)

  2. Lee, P.H., C.C. Torng, H.S. Liao and C.C. Tseng, 2009, The statistical performance of double sampling X-bar control charts for correlation data, 2009 IEEE International Conference on Industrial Engineering and Engineering Management, 2009/12/08-11, Hong Kong, People's Republic of China. (EI)

  3. Torng, C.C., H.N. Liao, P.H. Lee and J.C. Wu, 2009, Performance evaluation of a Tukey’s control chart in monitoring gamma distribution and short run processes, The International MultiConference of Engineers and Computer Scientists 2009, 2009/03/18-20, Hong Kong, People's Republic of China. (NSC 97-2221-E-224-032)(EI)
  4. Torng, C.C. and P.H. Lee, 2009, A modified statistical design model of double sampling Xbar control chart, The International MultiConference of Engineers and Computer Scientists 2009, 2009/03/18-20, Hong Kong, People's Republic of China. (NSC 97-2221-E-224-032)(EI)
  5. Lee, P.H. and C.C. Torng, 2008, A combined self-organizing map neural network with analysis graphical approach for Mixed-Weibull parameter estimation, 2008 IEEE International Conference on Industrial Engineering and Engineering Management, 2008/12/08-11, Singapore.(EI)