●研究活動:  

  研究方向與進度

 99 98 97 96 95 94

Meeting 報告-98年度:

 

 

 

報 告 主 題

報告者

簡報

日期
A new approach to robust economic design of control charts
欣卉 98/07/14
Control Charts for Monitoring Fault Signatures: Cuscore versus GLR 
秉裕 98/07/14
Application of Taguchi and response surface methodologies for geometric error in surface grinding process
欣卉 98/07/27
X-bar chart with adaptive sample sizes 秉裕 98/07/27
Joint economic design of EWMA control charts for mean and variance
欣卉 98/08/11

A synthetic control chart for monitoring process dispersion with sample standard deviation

秉裕 98/08/11
Two-Stage Short-Run ( X-bar , S) Control Charts
欣卉 98/08/25

A One-Sided EWMA Control Chart for Monitoring Proces Means

秉裕 98/08/25
The economically designed CUSUM chart for monitoring short production runs
欣卉 98/09/08

A simple and effective R chart to monitor the process variance

秉裕 98/09/08
An economic design of double sampling X-bar charts for correlated data using genetic algorithms
欣卉 98/10/14
Economic design of the VSSI X-bar control charts for correlated date 秉裕 98/10/14
A Model-Based Method for Organizing Tasks in Product Development 欣卉 98/12/09
Project scheduling for collaborative product development using DSM 秉裕 98/12/09
An optimal mixed policy of inspection and burn-in and the optimal production quantity 欣卉 99/01/03
Economic design of two-stage charts The Markov chain approach 秉裕 99/01/03
A Cumulative Sum Scheme for Monitoring Frequency and Size of an Event 欣卉 99/03/03
A new strategy for phase I analysis in SPC 秉裕 99/03/03
Robustness of the time between events CUSUM 欣卉 99/03/09
Technical Decomposition Approach of Critical to Quality Characteristic for Product Design for Six Sigma 仁宇 99/03/09
Six-sigma as a strategy for process improvement on construction projects a case study 仁宇 99/03/17
Adaptive CUSUM control chart with variable sampling intervals 秉裕 99/03/24
The sampling strategy of economic design of X-bar control charts for non-normally distributed data under Weibull shock models 仁宇 99/03/31
A control chart for the Gamma distribution as a model of time between events 欣卉 99/04/07
Design of EWMA and CUSUM control charts subject to random shift sizes and quality impacts 秉裕 99/04/14
A new variable sampling control scheme at fixed times for monitoring the process dispersion 仁宇 99/04/14
Combining preventive maintenance and statistical process control 欣卉 99/05/05
Economic-statistical design of 2-of-2 and 2-of-3 runs rule scheme 秉裕 99/05/05
Average run length when monitoring capability indices using EWMA 秉裕 99/05/12
Assessing the Impact of Preventive Maintenance Based on Censored Data 仁宇 99/05/12
  欣卉 99/05/19
  仁宇 99/05/19